AWF Krakow, Poland
High school for sports education.
Key Facts
Type of Installation:
Swimming pool / Indoor pool / Outdoor pool / Swimming pool
Arrangements:
New build sports pool tank:
Re-profiling the concrete; waterproofing installation transitions; insulating the pool tank and wet areas; joint sealing with jointing tapes in the overflow channels; installing ceramic tiles; filling the movement joints and seams.
- Concrete restoration
- Crack injection
- Floor coating
- Floor patching / Floor leveling / Substrate leveling
- Grouting
- Joint filling
- Joint sealing
- Penetrations / Inlets
- Primer
- Tile compound waterproofing
- Tile laying
- Wall patching
- Waterproofing
- Waterproof membrane
- Waterproof tape technology
Object size:
2200 m²
Completion date
2012
Products
Location:
Poland
/ Krakau
Architect:
ABM Solid S.A.
Applicator:
ABM Solid S.A.