Indoor swimming pool Wesseling
The Wesseling indoor swimming pool had been closed since August 2018. The pool, which was opened in 1966 had to be extensively modernised in order to conform to today's technical requirements and legal regulations. The renovation, originally planned for the summer of 2022 had to be postponed due to unexpected challenges and the Corona pandemic. The entrance area and the Foyer for example was rejigged as well as complete renovation of the teaching pool and the sports pool. The re-opening took place on the 13.05.2023.
Key Facts
Type of Installation:
Swimming pool / Indoor pool / Outdoor pool / Swimming pool
Arrangements:
Demolition of the existing finishes, preparation of the substrate, priming, levelling the substrate, waterproofing, tile installation and grouting
- Bonding primer
- Grouting
- Penetrations / Inlets
- Pipe penetrations
- Primer
- Tile compound waterproofing
- Tile laying
- Waterproofing
- Waterproof tape technology
Type of Construction Work
Renovation
Object size:
4500 m²
Completion date
4/2023
Location:
Germany
/ Wesseling
Applicator:
Fliesen Lepping GmbH & Co.KG
Max-Planck-Straße 2
48691 Vreden
Planner:
Planteam Ruhr