Baltic Beach Hotel
The Baltic Beach Hotel swimming and spa areas were comprehensively restored and renovated.
In addition a new smaller swimming pool, a children's pool and a whirlpool emerged. The installers fixed various mosaics to the pools. Saunas, showers and changing areas were also renewed.
Key Facts
Type of Installation:
Swimming pool / Indoor pool / Outdoor pool / Swimming pool
Arrangements:
Firstly concrete repairs to the swimming pool were carried out. Then the swimming pools and wet zones were waterproofed, re-tiled and grouted. Additionally a new screed was laid in the sauna areas.
- Coating
- Concrete restoration
- Floor patching / Floor leveling / Substrate leveling
- Grouting
- Insulation
- Joint filling
- Joint sealing
- Natural stone laying / Tile laying
- Primer
- Screed installation
- Tile compound waterproofing
- Tile laying
- Waterproofing
- Waterproof tape technology
Type of Construction Work
Renovation
Object size:
1050 m²
Duration of Work:
4 months
Products
Location:
Latvia
/ Jürmala
Applicator:
SIA "BBH Investments"
Jūras street 23/25, Jūrmala, LV-2015
Architect:
SIA "Alta grupa"
Kurzemes prospekts 56-4, Rīga, LV-1067