St. Antonius Church, Germany
Key Facts
Type of Installation:
Church / Abbey / Mosque
Arrangements:
The floor finish in the church was re-worked with our uncoupling adhesive UNIFIX-S3. The seating was partially removed, then the hollow sounding natural stone flooring was abraded, primed and new tiles bonded over the top.
- Crack injection
- Grouting
- Primer
- Restoration
- Tile laying
Type of Construction Work
Renovation
Object size:
540 m²
Duration of Work:
6 weeks
Location:
Germany
/ Büren
Architect:
Josef Zumdick
Fettpottweg 7
33142 Steinhausen
Applicator:
Massimo Turco Fliese
Bentelerstr.12
33449 Langenberg