Tauragé swimming pool, Lithuania
The newly constructed swimming pool in Tauragé offers it's guests a 25 m pool and a sauna.
Key Facts
Type of Installation:
Swimming pool / Indoor pool / Outdoor pool / Swimming pool
Arrangements:
It commenced with the levelling of the walls to the swimming pool tank. Then the swimming pool tank, sauna and areas adjacent to the pool were waterproofed after which the tiles could be laid.
- Concrete restoration
- Floor patching / Floor leveling / Substrate leveling
- Grouting
- Tile laying
- Wall patching
- Waterproofing
- Waterproof tape technology
Type of Construction Work
New Construction
Duration of Work:
12 months
Products
Location:
Lithuania
/ Tauragé
Applicator:
UAB Brosta
Sodų g. 7, Pareizgupio k., LT-60195